Home PDF Downloads Project Photos Press Releases F.A.Q. Contact Us

  Draft Reports l Drawings l Final Reports
1. Draft Air Quality Report (696KB)
2. Draft Contamination Screening Evaluation Report (47.4MB)
3. Draft Endangered Species Biological Assessment (9.23MB)
4. Draft Location Hydraulic Report (8.45MB)
5. Draft Wetland Evaluation Report (8.10MB)
6. Draft Preliminary Engineering Report (PER) (44.0MB)
7. Draft Environmental Document (CATX) (2.02MB)
8. Draft Noise Study Report (5.06MB)
9. Draft Determination of Section 4(f) Applicability - Gum Swamp
10.
11. Preliminary Pond and Mitigation Siting Report (9.23MB)
Blueprint2000.org · 1311 Executive Center Drive, Suite 109 · The Koger Center, Ellis Building
Tallahassee, FL 32301 · Tel: 850.891.1880 Fax: 850.891.1885
   
View CCSE Project Map View Project Timeline